Challenges and Logistics: Materials, Supply and Scheduling

Despite its success, the yard faced constant challenges. Steel plates, engines, auxiliary equipment and skilled labor were in high demand across the war industry. The yard had to coordinate material deliveries via rail and barge, manage scheduling of launches, and cope with labor turnover and training. In addition, weather in Florida — including high heat, humidity, storms and occasional hurricanes — imposed constraints. The yard’s management adopted continuous improvement practices: standardization of hull construction, modular outfitting, and repeated process flows helped reduce build times.

Material shortages also forced innovation: local subcontractors produced piping and fittings, and prefabrication elements were introduced. Documentation of the yard’s records shows substantial gains in cost efficiency as the program progressed. The war effort required not just speed, but reliability — the ships had to meet standards to serve in global ocean service.

The Auxiliary and Tanker Program


Although Liberty ships dominated the output, the shipyard also produced tanker-type vessels (like T1-M-BT1) and other auxiliary cargo variants under Maritime Commission contracts. For example, hulls MCc 2626 through 2629 (T1 class) were completed in September 1945.  

 These vessels carried petroleum, fuel oil or other liquid cargoes — essential to supporting naval operations and merchant fleet logistics.

Such diversification underscored the yard’s flexibility and capacity to respond to shifting priorities late in the war. As supply chains changed and newer ships were required, the yard adapted its production from standard cargo hulls to specialized tanker roles. shutdown123